COSMOCENTRO Shopping center
Visit website About the project — Este proyecto es … Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
LabCoreSoft
Visit site About the project — Este proyecto es … Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Sistema Estudiantes UTAO
Know more About the project — The ”Sistema Estudiantes UTAO” application is a tool created for students belonging to the Universidad Autónoma del Oriente. The UTAO Project is a compilation of products designed as a point of improvement for my university, facilitating processes within the educational institution. This project is a reinterpretation of an educational institution […]
Plan Colombia
Know more About the project — Plan Colombia seeks to be a tool that can connect foreign tourists with the diversity of Colombia during their stay in the country, getting to know the culture, food, and people creating plans or navigating freely through events, restaurants, places, and more. Plan Colombia was a final research and integration […]
Search Food
Know more About the project — Search Food born with the idea of giving more visibility to the gastronomic establishments of the city of Santiago de Cali, Colombia; through a web reservation system ”User – Search Food – Restaurant”. Search Food was a final research and integration project created for my university. After two and half […]
FANALCA: 2021 Sustainability report
Visit website About the project — Este proyecto es … Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Pasaporte a la luna
Visit site About the project — Este proyecto es … Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo. Responsive. Responsive.Responsive. Responsive. Responsive. Responsive. Responsive. Responsive. Responsive. Responsive. Responsive.Responsive. Responsive. Responsive. Responsive. Responsive. Responsive. Responsive.
ICCO: Rural Paz
Visit site About the project — Este proyecto es … Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.